OZEV approved EV charger installation
Authorised installers for Andersen, Pod Point, EO and Hive, approved by OZEV for both the domestic EV Chargepoint Grant and the Workplace Charging Scheme (WCS).
Choose the charger, we'll handle the install
A selection of recent Andersen charger installs
As an authorised Andersen installer we fit the full A2, A3 and Quartz range across West London — on driveways, garage walls and commercial forecourts, in a choice of finishes to match the property. Read more about why we rate Andersen so highly, including our bespoke installs for high-end cars.

Andersen EV charger — contemporary new-build, dusk install

Andersen EV charger, white — rendered wall, uplighting either side

Andersen EV charger, graphite — beside a period-style garage door

Andersen EV charger, sage & wood — stone wall driveway mount

Andersen EV charger, wood & silver finish — detail

Andersen EV charger, graphite finish — detail
EV Chargepoint Grant (flats, renters & landlords)
Since 2022, homeowners with their own driveway are no longer eligible for a home charging grant — but renters, flat owners/leaseholders and residential landlords still can be. As an OZEV approved installer we handle the grant application and claim on your behalf as part of the installation.
- Flats & Renters Grant — for tenants and flat owners with dedicated off-street parking
- Residential Landlord Chargepoint Grant — for landlords installing chargers across rental properties, up to 200 sockets
Grant rates and eligibility are set by OZEV and can change — we'll confirm the current amount and what evidence you'll need before any work starts. Full detail is on the official GOV.UK grant guidance.
Workplace Charging Scheme (WCS)
The Workplace Charging Scheme helps businesses across Slough, Uxbridge and the wider region fund charge points for staff and fleet vehicles. We're OZEV approved to install and claim under the WCS, including for state-funded schools and colleges.
From survey to switch-on
1. Survey
We check your consumer unit, supply and parking to confirm the install is straightforward.
2. Grant check
We confirm your eligibility and handle the OZEV application paperwork.
3. Install
Typically a half-day job, including any consumer unit work needed to support the charger circuit.
4. Sign-off
Certification issued and the grant claimed directly, so it's deducted from your final bill.


